04/2010 – 01/2011 – Projectmanagement for DMS Migrations and Archiving Solutions

Analysis of CMS/DMS systems to be migrated and/or archived. Various projects with the objective to
consolidate Document Management Systems (DMS) are estimated, initiated, staffed with skilled resources (internal and external) and managed. Preparation of decision papers for projects sponsors.

Industry: Semiconductors (IT)
Role: Project manager, Business Analyst
Work site: Munich, Germany
Software: Oracle, EMC Documentum, OpenWorkbench, MS Access, MS Excel, Klusa, Java / JDK 1.6, Stellent CMS, Lotus Notes 8
Period: 04/2010 – 01/2011

 

04/2009 – 08/2009 - Projectmanagement / Consulting PPM - Upgrade CA Clarity 8.1 to 12.0.1 - Red Hat / Oracle

Projectmanagement, planning, concept and consulting for an upgrade of CA Clarity PPM 7.5.1 to 12.0.1
Based on the current implementation detailed test cases have been developed. Tests have been performed on a prototype upgrade and required adjustments have been identified this way. The planning for all required upgrade steps has been done incl. the hardware migration from Sun Solaris 9 to Red Hat Enterprise Linux 5 (cluster) utilized by a load balancer (new). Another taks was the upgrade to Oracle 10.2.0.4 and a migration of tablespaces.
Management of backoffice resources, coordination with the customers Projectmanagement office and weekly reporting.

Industry: Logistics, Transport (IT)
Role: Senior Consultant PPM, Projectmanager, CA Clarity Expert
Work site: Hamburg, Germany
Software: CA Clarity PPM 12.0.1, Oracle 10g, Sun Solaris, Red Hat Enterprise 5, Windows 2003, VMWare Server 2.0.0, MS Project 2003, OpenWorkbench 1.6, Apache Tomcat 5.5.17, Actuate 9, JDK 1.5.0_11, Clarity Studio
Period: 04/2009 – 08/2009

 

10/2009 – 04/2010 - PPM Consulting, Business Analysis, Process Optimization

PPM Consulting, Business Analysis, Process Optimization
As part of an evaluation initiative the analysis and description of existing Project-Portfoliomanagement and Stage-Gate processes has been performed. Additionally requirements have beend defined in order to align existing processes to industry standards.
Preparation of decisionpapers for management.


Industry:Telecommunications (PD)
Role: Senior Consultant PPM
Work site: Bonn, Germany
Software: Aris Business Designer, Aris Business Architect, Aris Express
Period: 10/2009 – 05/2010

 

03/2010 – 07/2010 - Implementation CA Clarity PPM 12.0.1

Implementation of a previously designed solution for Project-, Resource- and Portfoliomanagement based
on CA Clarity PPM 12.0.1. Implementation of interfaces to and from SAP, supporting Go-Live and
coordinating two external IT service suppliers.


Industry: Automotive (IT)
Role: Senior Consultant PPM, CA Clarity PPM Expert
Work site: Munich, Germany
Software: CA Clarity PPM 12.0.1, Oracle 10.2.0.4, SuSE Linux 10, XML, XDM, SQL, IBM WebSphere 6.1 Application Server (Cluster), Business Objects 10 R2, Clarity Studio
Period: 03/2010 – 07/2010

 

01/2009 – 04/2009 - Projectmanagement Roll-Out CA Clarity 8.1 PPM - AIX / Oracle

Consulting, Projectmanagement, Planning, Concept for a Roll-Out of CA Clarity PPM 8.1 into additional division (partition) of a company already using Clarity incl. Implementation of custom SAP-interfaces (KPGM-certified), Clarity-Configuration and required modificationd in Clarity Studio.

Industry: Bank / Payment (R&D)
Role: Projectmanager, Business Analyst, CA Clarity Expert (Freelancer)
Work site: Munich, Germany
Software: CA Clarity PPM 8.1, Oracle 10g, IBM AIX 5.3, MS Project 2003, Apache 5.5.17, Java (J2EE), JDK 1.5.0_11
Period: 01/2009 – 04/2009

 