Search Only:

Search Keyword projektleitung

Total: 27 results found.

Page 1 of 2
Projectmanagement and technical consulting for a upgrade of the PPM-Software Niku 6.1.4 to version Niku 6.1.5 Industry: Public services (PS, IT) Work site: Berne, Switzerland Software: Actuate 7 SP2 ...
Technical Consulting and Project Management PPM (Subproject technical implementation). Upgrade of the PPM-Standard-Software Niku 6.1.4 to CA Clarity 7.0.2. Industry: Energy supplier (IT) Role: Projectmanager, ...
Technical Consulting for Project-/Portfolio-Management (PPM) and Projectmanagement for Customizing and Roll-Out of the PPM-Standard-Software Niku 6.1.4 (later: CA Clarity PPM). Industry: Electricity ...
Projectmanagement and Consulting for a upgrade of CA Clarity 7.5 to version 7.5.3. The upgrade was roll-out and Clarity Portlets and Actuate reports have been modified based on customer requirements.  ...
Technical Consulting and Projectmanagement for a Roll-Out / Implementation of the PPM-Standard-Software CA Clarity 7.5 incl. custom configuration and initial import of resource- und project-data. Industry: ...
Projectmanagement, Concept and Design of Actuate 7 Reports for CA Clarity 7.5.1. To Rollout CA Clarity in additional, internationale Divisions of the organisation a multilevel, complex MS Word/Excel solution ...
Projectmanagement and technical Consulting for an Upgrade of CA Clarity 7.5 to 7.5.2 - Preparation, Planning and Roll-Out on Test- und Production Systems. Industry: Insurance (PD) Role: Projectmanager, ...
Projectmanagement, Concept, Design and Implementation of a framework to manage software-development projects based on CA Clarity 7.5.1 (Portlets, Actuate Reports, XML, Processes/Workflows). The full ...
9. 11/2007 – 06/2008 - Projectmanagement DMS Migration MatrixOne to EMC Documentum
(Projects/Projekte Freiberuflich - Deutsch (DE-CH-AT))
A project for a DMS Migration from Enovia MatrixOne to EMC Documentum was plamnned, initiatedand managed. The project was part of a Post Merger Integration program affecting approx 700 users. Coordination ...
Projectmanagement, Consulting, Concept, Design and Implementation / Roll-Out of an Resource-Import-Interface for CA Clarity 7.5.1. The user data is collected from various systems all over the world in ...
11. 05/2008 – 01/2009 - Projectmanagement / Business Analysis Lotus Notes Consolidation
(Projects/Projekte Freiberuflich - Deutsch (DE-CH-AT))
A global Lotus Notes application landscape (800 applications) had to be consolidated. In preparation for that analysis methods for the documentation of the covered business processes and information architectures ...
Projectmanagement, planning, concept and consulting for an upgrade of CA Clarity PPM 7.5.1 to 12.0.1 Based on the current implementation detailed test cases have been developed. Tests have been performed ...
13. 01/2009 – 04/2009 - Projectmanagement Roll-Out CA Clarity 8.1 PPM - AIX / Oracle
(Projects/Projekte Freiberuflich - Deutsch (DE-CH-AT))
Consulting, Projectmanagement, Planning, Concept for a Roll-Out of CA Clarity PPM 8.1 into additional division (partition) of a company already using Clarity incl. Implementation of custom SAP-interfaces ...
Projektleitung und technisch Beratung für ein Upgrade der PPM-Software Niku 6.1.4 auf Niku 6.1.5 Branche: Öffentlicher Dienst (PS, IT) Einsatzort: Bern, Schweiz Software: Actuate 7 SP2 Reporting Server, ...
Technische Beratung PPM, Teil-Projektleitung und Durchführung eines Upgrades der PPM-Software Niku 6.1.4 auf Ca Clarity 7.0.2. Branche: Energieversorger (IT) Einsatzort: Oldenburg, Germany Software: Actuate ...
Technische Beratung Projekt-/Portfolio-Management (PPM), Teil-Projektleitung und Durchführung der Implementierung und des Customizings der PPM-Standard-Software Niku 6.1.4 (später: CA Clarity PPM). Branche: ...
Projektleitung und Beratung beim Upgrade CA Clarity 7.5 nach 7.5.3. Das Upgrade von Clarity wurde durchgeführt und Clarity Portlets und Actuate Standardreports nach Kundenwünschen erweitert. Branche: ...
Technische Beratung und Teilprojektleitung für die Implementierung und den Roll-Out der PPM-Standard-Software CA Clarity 7.5 und kundenspezifische Konfiguration, sowie initialer Import von Ressource- und ...
Projektleitung, Konzeption und Design Actuate 7 Reports für CA Clarity 7.5.1. Für den Rollout in weitere, internationale Abteilungen im Unternehmen wurde eine mehrstufige, komplexe MS Word/Excel Lösung ...
Projektleitung und technische Beratung für ein Upgrade CA Clarity 7.5 nach 7.5.2 - Vorbereitung, Planung und Durchführung auf Test- und Produktivsystem. Branche: Versicherungen (PD) Einsatzort: Zürich, ...
<< Start < Prev 1 2 Next > End >>