Search Only:

Search Keyword migration

Total: 18 results found.

Technical Consutling and Roll-Out of an upgrade for the PPM-/ERP-Software NIKU 6.0 to version 6.1.4 incl. configuration and migration ('collations') of database contents. Industry: IT/TK Work site: Greifswald, ...
Technical Consulting and Roll-Out of an upgrade of the PPM-Software NPM 5.3 to CA Clarity 7.5.1 incl. migration/upgrade of the database (Oracle 8 to 9). Additionally existing MS Access reports have been ...
Technical Consulting and Roll-out of an upgrade of the PPM-/ERP-Software NPM 5 to NIKU 6, incl. configuration, data model extension and data migration. Industry: Public service (IT) Work site: Berne, ...
4. 09/2005 - 09/2005 - Technical Consulting Database-Upgrade Oracle 8 to 9 - Niku 6.1.5
(Projects/Projekte Freiberuflich - Deutsch (DE-CH-AT))
Migration/Upgrade of an Oracle 8.1.7.4 database to version 9.2.0.6 for use with the PPM-Software Niku 6.1.5. Industry: Public services (IT, Professional Services) Work site: Berne, Switzerland Software: ...
5. 11/2007 – 06/2008 - Projectmanagement DMS Migration MatrixOne to EMC Documentum
(Projects/Projekte Freiberuflich - Deutsch (DE-CH-AT))
A project for a DMS Migration from Enovia MatrixOne to EMC Documentum was plamnned, initiatedand managed. The project was part of a Post Merger Integration program affecting approx 700 users. Coordination ...
Technical Consulting, Business-/Processanalysis, Concept for a CA Clarity PPM 8.1 Implementation and Roll-Out incl. migration of users/functionality of the PM-Tool Artemis. Required design of interfaces ...
7. 05/2008 – 01/2009 - Projectmanagement / Business Analysis Lotus Notes Consolidation
(Projects/Projekte Freiberuflich - Deutsch (DE-CH-AT))
... have been evaluated and chosen. The final analysis was the basis for effort estimation and management decision making for potential migration projects to follow. Industry: Semiconductors (IT)  Role: ...
8. Soft-Skills
(CV/Skills - Deutsch (DE-CH-AT))
... Migrations / Change Management Trainings, Knowledge Transfer / Go-Live Support Document- and Knowledgemanagement  ...
... on a prototype upgrade and required adjustments have been identified this way. The planning for all required upgrade steps has been done incl. the hardware migration from Sun Solaris 9 to Red Hat Enterprise ...
10. 04/2010 – 01/2011 – Projectmanagement for DMS Migrations and Archiving Solutions
(Projects/Projekte Freiberuflich - Deutsch (DE-CH-AT))
Analysis of CMS/DMS systems to be migrated and/or archived. Various projects with the objective to consolidate Document Management Systems (DMS) are estimated, initiated, staffed with skilled resources ...
Technische Beratung, Durchführung und Roll-Out eines Upgrade der PPM-Software NPM 5.3 auf CA Clarity 7.5.1 inkl. Migration der Datenbank von Oracle 8 auf 9. Des weiteren wurden bestehende MS Access-Berichte ...
Technische Beratung und Durchführung eines Upgrades der PPM-/ERP-Software von NPM 5 auf NIKU 6, inkl. Konfiguration, Datenmodellerweiterung und Datenmigration. Branche: öffentl. Dienst Einsatzort: Bern, ...
Migration der Datenbank Oracle 8.1.7.4 auf Oracle 9.2.0.6 für die PPM-Software Niku 6.1.5. Branche: Öffentlicher Dienst (IT, Professional Services) Einsatzort: Bern, Switzerland Software: Oracle 8.7.1.4 ...
Die Durchführung einer DMS Migration von Enovia MatrixOne zu EMC Documentum wurde geplant, initiiert und geleitet. Das Projekt DMS Migration war Teil eines Post Merger Integrationsprogramms für ca 700 ...
... soll für die Kostenschätzungen von potentiell folgenden Migrationsprojekten geschaffen werden und damit Entscheidungsgrundlage für das IT Management sein. Branche: Halbleiter (IT)    Rolle: Projektleiter, ...
16. Soft-Skills
(CV/Skills)
Project Management / Scope-, Risk-, Stakeholdermanagement) Business Analysis / Requirements Management Solution Architecture Roll-Out Planning, Preparation & Execution Implementations, Migrations ...
... den notwendigen Anpassungsbedarf aufzeigen. Des weiteren wurde die Planung der notwendige Upgrade-Schritte durchgeführt inkl. Migration von Solaris 9 auf Red Hat Enterprise Linux 5 auf neuer Hardware (Cluster) ...
Analyse von CMS/DMS Systemen zur Migration und/oder Archivierung. In verschiedene Projekte mit dem Ziel der Konsolidierung von Dokumentmanagementsystemen (DMS) wurden Schätzungen, Initierung, Staffing ...